Place Primary Overhead Conductor
To place an Overhead Primary Conductor:
- Select OH Primary from the Electric Overhead Conductors Group.
- Click on the Place Feature Icon or double-click on the selected feature to start the placement command.
- Click on the Line Segment Mode Icon in the Placement Dialog.
- Change the default property values as necessary in the Placement Form.
- Click at the start location for the conductor. If it's within tolerance of a pole or device, the features highlight to indicate inferred Attachment and Connection relationships at the start node.
- Click at the end location for the conductor. If it's within tolerance of a pole or devices, the features highlight to indicate inferred Attachment and Connection relationships at the end node.
- Right-Click (Reset) to complete the placement.
- Click at a location to place Phase Annotation Text.