Bentley OpenUtilities CONNECT Edition Help

Place Primary Overhead Conductor

To place an Overhead Primary Conductor:

  1. Select OH Primary from the Electric Overhead Conductors Group.
  2. Click on the Place Feature Icon or double-click on the selected feature to start the placement command.
  3. Click on the Line Segment Mode Icon in the Placement Dialog.

  4. Change the default property values as necessary in the Placement Form.

  5. Click at the start location for the conductor. If it's within tolerance of a pole or device, the features highlight to indicate inferred Attachment and Connection relationships at the start node.

  6. Click at the end location for the conductor. If it's within tolerance of a pole or devices, the features highlight to indicate inferred Attachment and Connection relationships at the end node.

  7. Right-Click (Reset) to complete the placement.
  8. Click at a location to place Phase Annotation Text.

Note: The command automatically restarts and is ready to place another feature.